Projects
With more than 650 MW of project development and investment experience, Citus Power continues to be one of the leading renewable energy investors in Turkey, Southeast Europe, and Africa.
As one of Turkey’s top solar PV EPC companies, we continue to serve solar PV investors who demand highest quality equipment and construction quality. We look forward to becoming the most demanded EPC company in Southeast Europe, Turkey, and Africa.
- All Projects
- EPC
- Project Development and Investment
1.1 MWp Balsu Food
Balsu Food is Turkey’s leading hazelnut producer and exporter. The company decided to procure its electricity from solar energy. The project is planned to become operational by mid 2022.
- Location: Sakarya, Turkey
- COD: Mid 2022
- Power: 1.1 MWp
- Solar Panel: Arçelik 450W
- Inverter: Sungrow SG110CX
- Mounting System: İsotec
- Roofing Type: Metal roofing
89 kWp Koç University Hospital
Citus Power has been the EPC of choice for Koç University Hospital, one of the top hospitals in Turkey.
- Location: İstanbul, Turkey
- COD: 2022
- Power: 89 kWp
- Solar Panel: Arçelik 450W
- Inverter: Solaredge SE33.3K
- Mounting System: İsotec İsoflat
- Roofing Type: Flat concrete roof
2.3 MWp Senegal Dakar Stadium
The project is going to become the largest solar PV + generator hybrid system in West Africa. It is also going to be the largest carport solar PV system in the region.
- Location: Dakar, Senegal
- COD: 2021
- Power: 2.3 MWp
- Solar Panel: Trina Solar 450W
- Inverter: Sungrow SG110CX
- Mounting Type: Carport




570 kWp DP World Yarımca Sea Port
Citus Power has been the EPC of choice for DP World Yarimca Sea Port, one of the busiest ports near Istanbul, Turkey.
- Location: Kocaeli, Turkey
- COD: 2021
- Power: 570 kWp
- Solar Panel: Elin Sirius 450W
- Inverter: Sungrow SG110CX
- Mounting System: İsotec İsotrap
- Roofing Type: Metal roofing




286 kWp Yılmaz Sac Factory
Citus Power has been the EPC of choice for Yılmaz Sac, a leading steel products manufacturer based in the industrial zone of Kayseri.
- Location: Kayseri, Turkey
- COD: 2021
- Power: 286 kWp
- Solar Panel: Elin Sirius 450W
- Inverter: Sungrow SG110CX, SG33CX
- Mounting System: İsotec İsotrap
- Roofing Type: Metal roofing




316 kWp Eksun Food
Citus Power has been the EPC of choice for Eksun Food, producer of Turkey’s most famous flour brands.
- Location: Tekirdağ, Turkey
- COD: 2021
- Power: 316 kWp
- Solar Panel: Arçelik 445W
- Inverter: Solaredge SE82.8K, SE27.6K
- Mounting System: İsotec İsotrap + İsoflat
- Roofing Type: Metal roofing + flat concrete surface




120 kWp Teksan Generator
Citus Power has been the EPC of choice for Teksan Generator, leading generator brand globally.
- Location: İstanbul, Turkey
- COD: 2021
- Power: 120 kWp
- Solar Panel: Elin Sirius 445W
- Inverter: Huawei 100KTL
- Mounting System: İsotec İsotrap + İsoflat
- Roofing Type: Metal roofing + flat concrete surface




50 MW GR WPP Greece
As part of Citus Power’s own renewable energy portfolio, this old project with low wind measurements was acquired by Citus Power in 2020 with the purpose of repowering the project with new generation larger turbines to make the project feasible.
- Location: Greece
- Expected COD: 2025
- Power: 50 MW
8.98 MWp Yahyalı SPP
As part of Citus Power’s own renewable energy portolio, development of the project started in 2014. Citus power acted as developer, investor, EPC and operator of the project after its COD in 2016. This solar PV power plant is one of the early generation of MW-scale projects in Turkey and was the sixth largest solart PV plant at COD.
- Location: Kayseri, Turkey
- COD: 2016
- Power: 8.98 MWp
- Solar Panel: Trina Solar 260W
- Inverter: Diehl Platinum R3-MDX-16K
- Mounting System: Alkor
- Certification/Controls: UL-Dewi




60 MW Avlağı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
- Location: Kayseri, Turkey
- Power: 60 MW
- Date: 2013-2015


51 MW Savaştepe WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
- Location: Balıkesir, Turkey
- Power: 51 MW
- Date: 2013-2015


60 MW Karamusalar WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
- Location: Çanakkale, Turkey
- Power: 60 MW
- Date: 2013-2015


54 MW Eskibektaşlı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
- Location: Sivas, Turkey
- Power: 54 MW
- Date: 2013-2015

1.1 MWp Balsu Food
Balsu Food is Turkey’s leading hazelnut producer and exporter. The company decided to procure its electricity from solar energy. The project is planned to become operational by mid 2022.
- Location: Sakarya, Turkey
- COD: Mid 2022
- Power: 1.1 MWp
- Solar Panel: Arçelik 450W
- Inverter: Sungrow SG110CX
- Mounting System: İsotec
- Roofing Type: Metal roofing
89 kWp Koç University Hospital
Citus Power has been the EPC of choice for Koç University Hospital, one of the top hospitals in Turkey.
- Location: İstanbul, Turkey
- COD: 2022
- Power: 89 kWp
- Solar Panel: Arçelik 450W
- Inverter: Solaredge SE33.3K
- Mounting System: İsotec İsoflat
- Roofing Type: Flat concrete roof
2.3 MWp Senegal Dakar Stadium
The project is going to become the largest solar PV + generator hybrid system in West Africa. It is also going to be the largest carport solar PV system in the region.
- Location: Dakar, Senegal
- COD: 2021
- Power: 2.3 MWp
- Solar Panel: Trina Solar 450W
- Inverter: Sungrow SG110CX
- Mounting Type: Carport




570 kWp DP World Yarımca Sea Port
Citus Power has been the EPC of choice for DP World Yarimca Sea Port, one of the busiest ports near Istanbul, Turkey.
- Location: Kocaeli, Turkey
- COD: 2021
- Power: 570 kWp
- Solar Panel: Elin Sirius 450W
- Inverter: Sungrow SG110CX
- Mounting System: İsotec İsotrap
- Roofing Type: Metal roofing




286 kWp Yılmaz Sac Factory
Citus Power has been the EPC of choice for Yılmaz Sac, a leading steel products manufacturer based in the industrial zone of Kayseri.
- Location: Kayseri, Turkey
- COD: 2021
- Power: 286 kWp
- Solar Panel: Elin Sirius 450W
- Inverter: Sungrow SG110CX, SG33CX
- Mounting System: İsotec İsotrap
- Roofing Type: Metal roofing




316 kWp Eksun Food
Citus Power has been the EPC of choice for Eksun Food, producer of Turkey’s most famous flour brands.
- Location: Tekirdağ, Turkey
- COD: 2021
- Power: 316 kWp
- Solar Panel: Arçelik 445W
- Inverter: Solaredge SE82.8K, SE27.6K
- Mounting System: İsotec İsotrap + İsoflat
- Roofing Type: Metal roofing + flat concrete surface




120 kWp Teksan Generator
Citus Power has been the EPC of choice for Teksan Generator, leading generator brand globally.
- Location: İstanbul, Turkey
- COD: 2021
- Power: 120 kWp
- Solar Panel: Elin Sirius 445W
- Inverter: Huawei 100KTL
- Mounting System: İsotec İsotrap + İsoflat
- Roofing Type: Metal roofing + flat concrete surface




50 MW GR WPP Greece
As part of Citus Power’s own renewable energy portfolio, this old project with low wind measurements was acquired by Citus Power in 2020 with the purpose of repowering the project with new generation larger turbines to make the project feasible.
- Location: Greece
- Expected COD: 2025
- Power: 50 MW
8.98 MWp Yahyalı SPP
As part of Citus Power’s own renewable energy portolio, development of the project started in 2014. Citus power acted as developer, investor, EPC and operator of the project after its COD in 2016. This solar PV power plant is one of the early generation of MW-scale projects in Turkey and was the sixth largest solart PV plant at COD.
- Location: Kayseri, Turkey
- COD: 2016
- Power: 8.98 MWp
- Solar Panel: Trina Solar 260W
- Inverter: Diehl Platinum R3-MDX-16K
- Mounting System: Alkor
- Certification/Controls: UL-Dewi




60 MW Avlağı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
- Location: Kayseri, Turkey
- Power: 60 MW
- Date: 2013-2015


51 MW Savaştepe WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
- Location: Balıkesir, Turkey
- Power: 51 MW
- Date: 2013-2015


60 MW Karamusalar WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
- Location: Çanakkale, Turkey
- Power: 60 MW
- Date: 2013-2015


54 MW Eskibektaşlı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
- Location: Sivas, Turkey
- Power: 54 MW
- Date: 2013-2015