Çizmeci Food

Çizmeci Food
Location
Eskişehir, Türkiye
Power
5.2 MWp
Year
2025
Acacia Mining

Acacia Mining
Location
Ankara, Türkiye
Power
65 MWp
Year
2025
Artaş European Trade Centre

Artaş European Trade Centre
Location
İstanbul, Türkiye
Power
700 kWp
Year
2024
Gazi Metal
Gazi Metal
Location
Türkiye
Power
4.0 MWp
Year
2023
Astas Aluminum

Astas Aluminum
Location
Tekirdağ, Türkiye
Power
2.7 MWp
Year
2023
ASA Energy Storage Project
ASA Enerji Depolama
As part of Citus Power’s own renewable energy portfolio, development of this project started in 2023 and is expected to reach ready-to-build stage in late 2024.
Location
Greece
Power
115 MWp
Year
2023
Teksan Generator 2

Teksan Generator 2
Turkey's leading generator manufacturer Teksan preferred Citus Power to build its second stage industrial rooftop SPP.
Location
İstanbul, Türkiye
Power
205 kWp
Year
2022
Dost Technical Textiles

Dost Technical Textiles
Dost Cırtbant, Turkey's leading technical textiles factory, preferred Citus Power for the installation of its rooftop SPP.
Location
Tekirdağ, Türkiye
Power
439 kWp
Year
2022
Karya Construction
Karya Construction
Location
İzmir, Türkiye
Power
319 kWp
Year
2022
Hidroser Hydraulic Systems

Hidroser Hydraulic Systems
Hidroser Hydraulic Systems, the world leader in the production of industrial control elements, preferred Citus Power to build its industrial rooftop SPP.
Location
Tekirdağ, Türkiye
Power
341 kWp
Year
2022
Tavuk Dünyası

Tavuk Dünyası Çatı Ges
Turkey's most popular and largest chain restaurant Tavuk Dünyası preferred Citus Power to build its industrial rooftop SPP.
Location
Ankara, Türkiye
Power
360 kWp
Year
2022
Balsu Food

Balsu Food
Balsu Food is Turkey’s leading hazelnut producer and exporter. The company decided to procure its electricity from solar energy. Balsu preferred Citus Power to build its industrial rooftop SPP.
Location
Sakarya, Türkiye
Power
1.1 MWp
Year
2022
Koç University Hospital

Koç University Hospital
One of Turkey's top private hospitals Koc University Hospital, preferred Citus Power to build its commercial rooftop SPP.
Location
İstanbul, Türkiye
Power
89 kWp
Year
2022
Senegal Dakar Stadium
Senegal Dakar Stadium
West Africa's largest hybrid carport solar system was built by Citus Power.
Location
Dakar, Senegal
Power
2.3 MWp
Year
2022
DP World Yarımca Sea Port

DP World Yarımca Sea Port
Operator of one of the busiest ports in İstanbul and also the world's leading port operator, DP World, preferred Citus Power to build its industrial rooftop SPP at its Yarımca sea port.
Location
Kocaeli, Türkiye
Power
570 kWp
Year
2021
Yılmaz Sac Factory

Yılmaz Sac Factory
Citus Power has been the EPC of choice for Yılmaz Sac, a leading steel products manufacturer based in the industrial zone of Kayseri.
Location
Kayseri, Türkiye
Power
286 kWp
Year
2021
Eksun Food

Eksun Food
Citus Power has been the EPC of choice for Eksun Food, producer of Turkey’s most famous flour brands.
Location
Tekirdağ, Türkiye
Power
316 kWp
Year
2021
Teksan Generator
Teksan Generator
Citus Power has been the EPC of choice for Teksan Generator, leading generator brand globally.
Location
İstanbul, Türkiye
Power
120 kWp
Year
2021
ASA KB2 SPP
ASA KB2 SPP
As part of Citus Power’s own renewable energy portfolio, development of this project started in 2020 and is expected to reach ready-to-build stage in late 2023.
Location
Yunanistan
Power
50 MWp
Year
2020
ASA KB1 SPP
ASA KB1 SPP
As part of Citus Power’s own renewable energy portfolio, development of this project started in 2020 and is expected to reach ready-to-build stage in late 2023.
Location
Yunanistan
Power
65 MWp
Year
2020
Gürün WPP
Gürün WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Locaiton
Sivas, Türkiye
Power
80 MWp
Year
2015
Kangal WPP
Kangal WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Location
Sivas, Türkiye
Power
80 MWp
Year
2015
Lapseki WPP
Lapseki WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Location
Çanakkale, Türkiye
Güç
50 MWp
Year
2015
Yahyalı SPP
Yahyalı SPP
As part of Citus Power’s own renewable energy portolio, development of the project started in 2014. Citus power acted as developer, investor, EPC and operator of the project after its COD in 2016. This solar PV power plant is one of the early generation of MW-scale projects in Turkey and was the sixth largest solart PV plant at COD.
Location
Kayseri, Türkiye
Güç
8.98 MWp
Year
2015
Eskibektaşlı WPP
Eskibektaşlı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Sivas, Türkiye
Power
54 MWp
Year
2013
Karamusalar WPP
Karamusalar WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Çanakkale, Türkiye
Power
60 MWp
Year
2013
Savaştepe WPP
Savaştepe WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Balıkesir, Türkiye
Power
51 MWp
Year
2013
Avlağı WPP
Avlağı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Kayseri, Türkiye
Power
60 MWp
Year
2013