Çizmeci Food

Çizmeci Food
Location
Eskişehir, Türkiye
Power
5.2 MWp
Year
2025
Category: Projects
Eskibektaşlı WPP
Eskibektaşlı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Sivas, Türkiye
Power
54 MWp
Year
2013
Installation Type
WPP
ASA KB2 SPP
ASA KB2 SPP
As part of Citus Power’s own renewable energy portfolio, development of this project started in 2020 and is expected to reach ready-to-build stage in late 2023.
Location
Yunanistan
Power
50 MWp
Year
2020
DP World Yarımca Sea Port

DP World Yarımca Sea Port
Operator of one of the busiest ports in İstanbul and also the world's leading port operator, DP World, preferred Citus Power to build its industrial rooftop SPP at its Yarımca sea port.
Location
Kocaeli, Türkiye
Power
570 kWp
İnverter
Sungrow SG110CX
Year
2021
Panel
Elin Sirius 450W
Installation Type
Rooftop SPP
Teksan Generator
Teksan Generator
Citus Power has been the EPC of choice for Teksan Generator, leading generator brand globally.
Location
İstanbul, Türkiye
Power
120 kWp
Inverter
Huawei 100KTL
Year
2021
Panel
Elin Sirius 445W
Installation Type
Rooftop SPP
Savaştepe WPP
Savaştepe WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Balıkesir, Türkiye
Power
51 MWp
Year
2013
Installation Type
WPP
Karamusalar WPP
Karamusalar WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Çanakkale, Türkiye
Power
60 MWp
Year
2013
Installation Type
WPP
Senegal Dakar Stadium
Senegal Dakar Stadium
West Africa's largest hybrid carport solar system was built by Citus Power.
Location
Dakar, Senegal
Power
2.3 MWp
Inverter
Sungrow SG110CX
Year
2022
Panel
Trina Solar 450W
Installation Type
Parking SPP
Astas Aluminum

Astas Aluminum
Location
Tekirdağ, Türkiye
Power
2.7 MWp
Inverter
Sungrow SG125CX-P2 ve Sungrow SG33CX
Year
2023
Panel
HSA 550W
Installation Type
Rooftop SPP



