Çizmeci Food

Çizmeci Food
Location
Eskişehir, Türkiye
Power
5.2 MWp
Year
2025
Category: Projects
Teksan Generator
Teksan Generator
Citus Power has been the EPC of choice for Teksan Generator, leading generator brand globally.
Location
İstanbul, Türkiye
Power
120 kWp
Inverter
Huawei 100KTL
Year
2021
Panel
Elin Sirius 445W
Installation Type
Rooftop SPP
Yılmaz Sac Factory

Yılmaz Sac Factory
Citus Power has been the EPC of choice for Yılmaz Sac, a leading steel products manufacturer based in the industrial zone of Kayseri.
Location
Kayseri, Türkiye
Power
286 kWp
Inverter
Sungrow SG110CX, SG33CX
Year
2021
Panel
Elin Sirius 450W
Installation Type
Rooftop SPP
Avlağı WPP
Avlağı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Kayseri, Türkiye
Power
60 MWp
Year
2013
Installation Type
WPP
Dost Technical Textiles

Dost Technical Textiles
Dost Cırtbant, Turkey's leading technical textiles factory, preferred Citus Power for the installation of its rooftop SPP.
Location
Tekirdağ, Türkiye
Power
439 kWp
Inverter
Huawei 60 KTL
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Tavuk Dünyası

Tavuk Dünyası Çatı Ges
Turkey's most popular and largest chain restaurant Tavuk Dünyası preferred Citus Power to build its industrial rooftop SPP.
Location
Ankara, Türkiye
Power
360 kWp
Inverter
SMA Sunny Tripower Core
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Kangal WPP
Kangal WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Location
Sivas, Türkiye
Power
80 MWp
Year
2015
Karamusalar WPP
Karamusalar WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Çanakkale, Türkiye
Power
60 MWp
Year
2013
Installation Type
WPP
Gürün WPP
Gürün WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Locaiton
Sivas, Türkiye
Power
80 MWp
Year
2015