Teksan Generator 2

Teksan Generator 2
Turkey’s leading generator manufacturer Teksan preferred Citus Power to build its second stage industrial rooftop SPP.
Location
İstanbul, Türkiye
Power
205 kWp
Inverter
Huawei 100KTL ve 60 KTL
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Category: Projects
DP World Yarımca Sea Port

DP World Yarımca Sea Port
Operator of one of the busiest ports in İstanbul and also the world's leading port operator, DP World, preferred Citus Power to build its industrial rooftop SPP at its Yarımca sea port.
Location
Kocaeli, Türkiye
Power
570 kWp
İnverter
Sungrow SG110CX
Year
2021
Panel
Elin Sirius 450W
Installation Type
Rooftop SPP
Eskibektaşlı WPP
Eskibektaşlı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Sivas, Türkiye
Power
54 MWp
Year
2013
Installation Type
WPP
Dost Technical Textiles

Dost Technical Textiles
Dost Cırtbant, Turkey's leading technical textiles factory, preferred Citus Power for the installation of its rooftop SPP.
Location
Tekirdağ, Türkiye
Power
439 kWp
Inverter
Huawei 60 KTL
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Astas Aluminum

Astas Aluminum
Location
Tekirdağ, Türkiye
Power
2.7 MWp
Inverter
Sungrow SG125CX-P2 ve Sungrow SG33CX
Year
2023
Panel
HSA 550W
Installation Type
Rooftop SPP
Avlağı WPP
Avlağı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Kayseri, Türkiye
Power
60 MWp
Year
2013
Installation Type
WPP
ASA KB1 SPP
ASA KB1 SPP
As part of Citus Power’s own renewable energy portfolio, development of this project started in 2020 and is expected to reach ready-to-build stage in late 2023.
Location
Yunanistan
Power
65 MWp
Year
2020