ASA KB2 SPP
ASA KB2 SPP
As part of Citus Power’s own renewable energy portfolio, development of this project started in 2020 and is expected to reach ready-to-build stage in late 2023.
Location
Yunanistan
Power
50 MWp
Year
2020
Category: Projects
Teksan Generator
Teksan Generator
Citus Power has been the EPC of choice for Teksan Generator, leading generator brand globally.
Location
İstanbul, Türkiye
Power
120 kWp
Inverter
Huawei 100KTL
Year
2021
Panel
Elin Sirius 445W
Installation Type
Rooftop SPP
Karya Construction
Karya Construction
Location
İzmir, Türkiye
Power
319 kWp
Inverter
Huawei 60 KTL
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Avlağı WPP
Avlağı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Kayseri, Türkiye
Power
60 MWp
Year
2013
Installation Type
WPP
Koç University Hospital

Koç University Hospital
One of Turkey's top private hospitals Koc University Hospital, preferred Citus Power to build its commercial rooftop SPP.
Location
İstanbul, Türkiye
Power
89 kWp
Inverter
Solar edge SE33.3K
Year
2022
Panel
Arçelik 450W
Installation Type
Rooftop SPP
Eskibektaşlı WPP
Eskibektaşlı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Sivas, Türkiye
Power
54 MWp
Year
2013
Installation Type
WPP