ASA KB2 SPP
50 MWp
ASA KB2 SPP
As part of Citus Power’s own renewable energy portfolio, development of this project started in 2020 and is expected to reach ready-to-build stage in late 2023.
Location
Yunanistan
Power
50 MWp
Year
2020
Category: Projects
DP World Yarımca Sea Port
570 kWp
DP World Yarımca Sea Port
Operator of one of the busiest ports in İstanbul and also the world's leading port operator, DP World, preferred Citus Power to build its industrial rooftop SPP at its Yarımca sea port.
Location
Kocaeli, Türkiye
Power
570 kWp
İnverter
Sungrow SG110CX
Year
2021
Panel
Elin Sirius 450W
Installation Type
Rooftop SPP
Astas Aluminum
2.7 MWp
Astas Aluminum
Location
Tekirdağ, Türkiye
Power
2.7 MWp
Inverter
Sungrow SG125CX-P2 ve Sungrow SG33CX
Year
2023
Panel
HSA 550W
Installation Type
Rooftop SPP
Yahyalı SPP
8.98 MWp
Yahyalı SPP
As part of Citus Power’s own renewable energy portolio, development of the project started in 2014. Citus power acted as developer, investor, EPC and operator of the project after its COD in 2016. This solar PV power plant is one of the early generation of MW-scale projects in Turkey and was the sixth largest solart PV plant at COD.
Location
Kayseri, Türkiye
Güç
8.98 MWp
İnverter
Diehl Platinum R3-MDX-16K
Year
2015
Panel
Trina Solar 260W
Installation Type
Ground-Mounted SPP
Kangal WPP
80 MWp
Kangal WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Location
Sivas, Türkiye
Power
80 MWp
Year
2015
Karamusalar WPP
60 MWp
Karamusalar WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Çanakkale, Türkiye
Power
60 MWp
Year
2013
Installation Type
WPP
Eskibektaşlı WPP
54 MWp
Eskibektaşlı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Sivas, Türkiye
Power
54 MWp
Year
2013
Installation Type
WPP
Lapseki WPP
50 MWp
Lapseki WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Location
Çanakkale, Türkiye
Güç
50 MWp
Year
2015
Savaştepe WPP
51 MWp
Savaştepe WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Balıkesir, Türkiye
Power
51 MWp
Year
2013
Installation Type
WPP