Avlağı WPP
60 MWp
Avlağı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Kayseri, Türkiye
Power
60 MWp
Year
2013
Installation Type
WPP
Category: Projects
Yahyalı SPP
8.98 MWp
Yahyalı SPP
As part of Citus Power’s own renewable energy portolio, development of the project started in 2014. Citus power acted as developer, investor, EPC and operator of the project after its COD in 2016. This solar PV power plant is one of the early generation of MW-scale projects in Turkey and was the sixth largest solart PV plant at COD.
Location
Kayseri, Türkiye
Güç
8.98 MWp
İnverter
Diehl Platinum R3-MDX-16K
Year
2015
Panel
Trina Solar 260W
Installation Type
Ground-Mounted SPP
Eksun Food
316 kWp
Eksun Food
Citus Power has been the EPC of choice for Eksun Food, producer of Turkey’s most famous flour brands.
Location
Tekirdağ, Türkiye
Power
316 kWp
Inverter
Solar edge SE82.8K, SE27.6K
Year
2021
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Senegal Dakar Stadium
2.3 MWp
Senegal Dakar Stadium
West Africa's largest hybrid carport solar system was built by Citus Power.
Location
Dakar, Senegal
Power
2.3 MWp
Inverter
Sungrow SG110CX
Year
2022
Panel
Trina Solar 450W
Installation Type
Parking SPP
Dost Technical Textiles
439 kWp
Dost Technical Textiles
Dost Cırtbant, Turkey's leading technical textiles factory, preferred Citus Power for the installation of its rooftop SPP.
Location
Tekirdağ, Türkiye
Power
439 kWp
Inverter
Huawei 60 KTL
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
SPP Project Development for one of Turkey’s leading mining companies
65 MWp
SPP Project Development for one of Turkey's leading mining companies
Location
Ankara, Türkiye
Power
65 MWp
Year
2022
Hidroser Hydraulic Systems
341 kWp
Hidroser Hydraulic Systems
Hidroser Hydraulic Systems, the world leader in the production of industrial control elements, preferred Citus Power to build its industrial rooftop SPP.
Location
Tekirdağ, Türkiye
Power
341 kWp
Inverter
Sungrow 110CX
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Lapseki WPP
50 MWp
Lapseki WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Location
Çanakkale, Türkiye
Güç
50 MWp
Year
2015