Artaş European Trade Centre

Artaş European Trade Centre
Location
İstanbul, Türkiye
Power
700 kWp
Year
2024
Category: Projects
Kangal WPP
Kangal WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Location
Sivas, Türkiye
Power
80 MWp
Year
2015
Karya Construction
Karya Construction
Location
İzmir, Türkiye
Power
319 kWp
Inverter
Huawei 60 KTL
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Teksan Generator 2

Teksan Generator 2
Turkey's leading generator manufacturer Teksan preferred Citus Power to build its second stage industrial rooftop SPP.
Location
İstanbul, Türkiye
Power
205 kWp
Inverter
Huawei 100KTL ve 60 KTL
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Teksan Generator
Teksan Generator
Citus Power has been the EPC of choice for Teksan Generator, leading generator brand globally.
Location
İstanbul, Türkiye
Power
120 kWp
Inverter
Huawei 100KTL
Year
2021
Panel
Elin Sirius 445W
Installation Type
Rooftop SPP
Yahyalı SPP
Yahyalı SPP
As part of Citus Power’s own renewable energy portolio, development of the project started in 2014. Citus power acted as developer, investor, EPC and operator of the project after its COD in 2016. This solar PV power plant is one of the early generation of MW-scale projects in Turkey and was the sixth largest solart PV plant at COD.
Location
Kayseri, Türkiye
Güç
8.98 MWp
İnverter
Diehl Platinum R3-MDX-16K
Year
2015
Panel
Trina Solar 260W
Installation Type
Ground-Mounted SPP
Eksun Food

Eksun Food
Citus Power has been the EPC of choice for Eksun Food, producer of Turkey’s most famous flour brands.
Location
Tekirdağ, Türkiye
Power
316 kWp
Inverter
Solar edge SE82.8K, SE27.6K
Year
2021
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Gürün WPP
Gürün WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Locaiton
Sivas, Türkiye
Power
80 MWp
Year
2015