Yahyalı SPP
Yahyalı SPP
As part of Citus Power’s own renewable energy portolio, development of the project started in 2014. Citus power acted as developer, investor, EPC and operator of the project after its COD in 2016. This solar PV power plant is one of the early generation of MW-scale projects in Turkey and was the sixth largest solart PV plant at COD.
Location
Kayseri, Türkiye
Güç
8.98 MWp
İnverter
Diehl Platinum R3-MDX-16K
Year
2015
Panel
Trina Solar 260W
Installation Type
Ground-Mounted SPP
Category: Projects
Eskibektaşlı WPP
Eskibektaşlı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Sivas, Türkiye
Power
54 MWp
Year
2013
Installation Type
WPP
ASA KB2 SPP
ASA KB2 SPP
As part of Citus Power’s own renewable energy portfolio, development of this project started in 2020 and is expected to reach ready-to-build stage in late 2023.
Location
Yunanistan
Power
50 MWp
Year
2020
Lapseki WPP
Lapseki WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Location
Çanakkale, Türkiye
Güç
50 MWp
Year
2015
ASA KB1 SPP
ASA KB1 SPP
As part of Citus Power’s own renewable energy portfolio, development of this project started in 2020 and is expected to reach ready-to-build stage in late 2023.
Location
Yunanistan
Power
65 MWp
Year
2020
Gürün WPP
Gürün WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Locaiton
Sivas, Türkiye
Power
80 MWp
Year
2015
ASA Energy Storage Project
ASA Enerji Depolama
As part of Citus Power’s own renewable energy portfolio, development of this project started in 2023 and is expected to reach ready-to-build stage in late 2024.
Location
Greece
Power
115 MWp
Year
2023