DP World Yarımca Sea Port

DP World Yarımca Sea Port
Operator of one of the busiest ports in İstanbul and also the world’s leading port operator, DP World, preferred Citus Power to build its industrial rooftop SPP at its Yarımca sea port.
Location
Kocaeli, Türkiye
Power
570 kWp
İnverter
Sungrow SG110CX
Year
2021
Panel
Elin Sirius 450W
Installation Type
Rooftop SPP
Category: Projects
ASA KB1 SPP
ASA KB1 SPP
As part of Citus Power’s own renewable energy portfolio, development of this project started in 2020 and is expected to reach ready-to-build stage in late 2023.
Location
Yunanistan
Power
65 MWp
Year
2020
Kangal WPP
Kangal WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Location
Sivas, Türkiye
Power
80 MWp
Year
2015
Hidroser Hydraulic Systems

Hidroser Hydraulic Systems
Hidroser Hydraulic Systems, the world leader in the production of industrial control elements, preferred Citus Power to build its industrial rooftop SPP.
Location
Tekirdağ, Türkiye
Power
341 kWp
Inverter
Sungrow 110CX
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Yılmaz Sac Factory

Yılmaz Sac Factory
Citus Power has been the EPC of choice for Yılmaz Sac, a leading steel products manufacturer based in the industrial zone of Kayseri.
Location
Kayseri, Türkiye
Power
286 kWp
Inverter
Sungrow SG110CX, SG33CX
Year
2021
Panel
Elin Sirius 450W
Installation Type
Rooftop SPP
ASA KB2 SPP
ASA KB2 SPP
As part of Citus Power’s own renewable energy portfolio, development of this project started in 2020 and is expected to reach ready-to-build stage in late 2023.
Location
Yunanistan
Power
50 MWp
Year
2020
Avlağı WPP
Avlağı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Kayseri, Türkiye
Power
60 MWp
Year
2013
Installation Type
WPP
Lapseki WPP
Lapseki WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Location
Çanakkale, Türkiye
Güç
50 MWp
Year
2015