ASA Energy Storage Project
ASA Enerji Depolama
As part of Citus Power’s own renewable energy portfolio, development of this project started in 2023 and is expected to reach ready-to-build stage in late 2024.
Location
Greece
Power
115 MWp
Year
2023
Category: Projects
Tavuk Dünyası

Tavuk Dünyası Çatı Ges
Turkey's most popular and largest chain restaurant Tavuk Dünyası preferred Citus Power to build its industrial rooftop SPP.
Location
Ankara, Türkiye
Power
360 kWp
Inverter
SMA Sunny Tripower Core
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Gürün WPP
Gürün WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Locaiton
Sivas, Türkiye
Power
80 MWp
Year
2015
Karya Construction
Karya Construction
Location
İzmir, Türkiye
Power
319 kWp
Inverter
Huawei 60 KTL
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Avlağı WPP
Avlağı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Kayseri, Türkiye
Power
60 MWp
Year
2013
Installation Type
WPP
Eksun Food

Eksun Food
Citus Power has been the EPC of choice for Eksun Food, producer of Turkey’s most famous flour brands.
Location
Tekirdağ, Türkiye
Power
316 kWp
Inverter
Solar edge SE82.8K, SE27.6K
Year
2021
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Lapseki WPP
Lapseki WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Location
Çanakkale, Türkiye
Güç
50 MWp
Year
2015
Karamusalar WPP
Karamusalar WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Çanakkale, Türkiye
Power
60 MWp
Year
2013
Installation Type
WPP