Dost Technical Textiles
439 kWp
Dost Technical Textiles
Dost Cırtbant, Turkey’s leading technical textiles factory, preferred Citus Power for the installation of its rooftop SPP.
Location
Tekirdağ, Türkiye
Power
439 kWp
Inverter
Huawei 60 KTL
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Category: Projects
Kangal WPP
80 MWp
Kangal WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Location
Sivas, Türkiye
Power
80 MWp
Year
2015
Eskibektaşlı WPP
54 MWp
Eskibektaşlı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Sivas, Türkiye
Power
54 MWp
Year
2013
Installation Type
WPP
Hidroser Hydraulic Systems
341 kWp
Hidroser Hydraulic Systems
Hidroser Hydraulic Systems, the world leader in the production of industrial control elements, preferred Citus Power to build its industrial rooftop SPP.
Location
Tekirdağ, Türkiye
Power
341 kWp
Inverter
Sungrow 110CX
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Balsu Food
1.1 MWp
Balsu Food
Balsu Food is Turkey’s leading hazelnut producer and exporter. The company decided to procure its electricity from solar energy. Balsu preferred Citus Power to build its industrial rooftop SPP.
Location
Sakarya, Türkiye
Power
1.1 MWp
Inverter
Sungrow SG110CX
Year
2022
Panel
Arçelik 450W
Installation Type
Rooftop SPP
SPP Project Development for Industrial Facility
12 MWp
SPP Project Development for Industrial Facility
Location
Ankara, Türkiye
Power
12 MWp
Year
2023
ASA Energy Storage Project
115 MWp
ASA Enerji Depolama
As part of Citus Power’s own renewable energy portfolio, development of this project started in 2023 and is expected to reach ready-to-build stage in late 2024.
Location
Greece
Power
115 MWp
Year
2023
Lapseki WPP
50 MWp
Lapseki WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Location
Çanakkale, Türkiye
Güç
50 MWp
Year
2015