Tete SPP
30 MWp
Tete SPP
Albania’s largest copper mine operation, also a Citus Power affiliate company, has preffered Citus Power to develop a 30MWp solar project for its own electricity consumption.
Location
Arnavutluk
Power
30 MWp
Year
2022
Category: Projects
Lapseki WPP
50 MWp
Lapseki WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Location
Çanakkale, Türkiye
Güç
50 MWp
Year
2015
Koç University Hospital
89 kWp
Koç University Hospital
One of Turkey's top private hospitals Koc University Hospital, preferred Citus Power to build its commercial rooftop SPP.
Location
İstanbul, Türkiye
Power
89 kWp
Inverter
Solar edge SE33.3K
Year
2022
Panel
Arçelik 450W
Installation Type
Rooftop SPP
SPP Project Development for Industrial Facility
12 MWp
SPP Project Development for Industrial Facility
Location
Ankara, Türkiye
Power
12 MWp
Year
2023
Kangal WPP
80 MWp
Kangal WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Location
Sivas, Türkiye
Power
80 MWp
Year
2015
Karamusalar WPP
60 MWp
Karamusalar WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Çanakkale, Türkiye
Power
60 MWp
Year
2013
Installation Type
WPP
Dost Technical Textiles
439 kWp
Dost Technical Textiles
Dost Cırtbant, Turkey's leading technical textiles factory, preferred Citus Power for the installation of its rooftop SPP.
Location
Tekirdağ, Türkiye
Power
439 kWp
Inverter
Huawei 60 KTL
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Savaştepe WPP
51 MWp
Savaştepe WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Balıkesir, Türkiye
Power
51 MWp
Year
2013
Installation Type
WPP
Avlağı WPP
60 MWp
Avlağı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Kayseri, Türkiye
Power
60 MWp
Year
2013
Installation Type
WPP