Artaş European Trade Centre

Artaş European Trade Centre
Location
İstanbul, Türkiye
Power
700 kWp
Year
2024
Category: Projects
Kangal WPP
Kangal WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Location
Sivas, Türkiye
Power
80 MWp
Year
2015
Senegal Dakar Stadium
Senegal Dakar Stadium
West Africa's largest hybrid carport solar system was built by Citus Power.
Location
Dakar, Senegal
Power
2.3 MWp
Inverter
Sungrow SG110CX
Year
2022
Panel
Trina Solar 450W
Installation Type
Parking SPP
ASA KB1 SPP
ASA KB1 SPP
As part of Citus Power’s own renewable energy portfolio, development of this project started in 2020 and is expected to reach ready-to-build stage in late 2023.
Location
Yunanistan
Power
65 MWp
Year
2020
Eksun Food

Eksun Food
Citus Power has been the EPC of choice for Eksun Food, producer of Turkey’s most famous flour brands.
Location
Tekirdağ, Türkiye
Power
316 kWp
Inverter
Solar edge SE82.8K, SE27.6K
Year
2021
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Yılmaz Sac Factory

Yılmaz Sac Factory
Citus Power has been the EPC of choice for Yılmaz Sac, a leading steel products manufacturer based in the industrial zone of Kayseri.
Location
Kayseri, Türkiye
Power
286 kWp
Inverter
Sungrow SG110CX, SG33CX
Year
2021
Panel
Elin Sirius 450W
Installation Type
Rooftop SPP
Astas Aluminum

Astas Aluminum
Location
Tekirdağ, Türkiye
Power
2.7 MWp
Inverter
Sungrow SG125CX-P2 ve Sungrow SG33CX
Year
2023
Panel
HSA 550W
Installation Type
Rooftop SPP
ASA KB2 SPP
ASA KB2 SPP
As part of Citus Power’s own renewable energy portfolio, development of this project started in 2020 and is expected to reach ready-to-build stage in late 2023.
Location
Yunanistan
Power
50 MWp
Year
2020




