Artaş European Trade Centre

Artaş European Trade Centre
Location
İstanbul, Türkiye
Power
700 kWp
Year
2024
Category: Projects
Yılmaz Sac Factory

Yılmaz Sac Factory
Citus Power has been the EPC of choice for Yılmaz Sac, a leading steel products manufacturer based in the industrial zone of Kayseri.
Location
Kayseri, Türkiye
Power
286 kWp
Inverter
Sungrow SG110CX, SG33CX
Year
2021
Panel
Elin Sirius 450W
Installation Type
Rooftop SPP
Astas Aluminum

Astas Aluminum
Location
Tekirdağ, Türkiye
Power
2.7 MWp
Inverter
Sungrow SG125CX-P2 ve Sungrow SG33CX
Year
2023
Panel
HSA 550W
Installation Type
Rooftop SPP
Hidroser Hydraulic Systems

Hidroser Hydraulic Systems
Hidroser Hydraulic Systems, the world leader in the production of industrial control elements, preferred Citus Power to build its industrial rooftop SPP.
Location
Tekirdağ, Türkiye
Power
341 kWp
Inverter
Sungrow 110CX
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
ASA Energy Storage Project
ASA Enerji Depolama
As part of Citus Power’s own renewable energy portfolio, development of this project started in 2023 and is expected to reach ready-to-build stage in late 2024.
Location
Greece
Power
115 MWp
Year
2023
Tavuk Dünyası

Tavuk Dünyası Çatı Ges
Turkey's most popular and largest chain restaurant Tavuk Dünyası preferred Citus Power to build its industrial rooftop SPP.
Location
Ankara, Türkiye
Power
360 kWp
Inverter
SMA Sunny Tripower Core
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Yahyalı SPP
Yahyalı SPP
As part of Citus Power’s own renewable energy portolio, development of the project started in 2014. Citus power acted as developer, investor, EPC and operator of the project after its COD in 2016. This solar PV power plant is one of the early generation of MW-scale projects in Turkey and was the sixth largest solart PV plant at COD.
Location
Kayseri, Türkiye
Güç
8.98 MWp
İnverter
Diehl Platinum R3-MDX-16K
Year
2015
Panel
Trina Solar 260W
Installation Type
Ground-Mounted SPP
Lapseki WPP
Lapseki WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Location
Çanakkale, Türkiye
Güç
50 MWp
Year
2015