Eskibektaşlı WPP
Eskibektaşlı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Sivas, Türkiye
Power
54 MWp
Year
2013
Installation Type
WPP
Category: Projects
Gürün WPP
Gürün WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Locaiton
Sivas, Türkiye
Power
80 MWp
Year
2015
Karamusalar WPP
Karamusalar WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Çanakkale, Türkiye
Power
60 MWp
Year
2013
Installation Type
WPP
Kangal WPP
Kangal WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Location
Sivas, Türkiye
Power
80 MWp
Year
2015
Eksun Food

Eksun Food
Citus Power has been the EPC of choice for Eksun Food, producer of Turkey’s most famous flour brands.
Location
Tekirdağ, Türkiye
Power
316 kWp
Inverter
Solar edge SE82.8K, SE27.6K
Year
2021
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Avlağı WPP
Avlağı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Kayseri, Türkiye
Power
60 MWp
Year
2013
Installation Type
WPP
Lapseki WPP
Lapseki WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Location
Çanakkale, Türkiye
Güç
50 MWp
Year
2015
Yılmaz Sac Factory

Yılmaz Sac Factory
Citus Power has been the EPC of choice for Yılmaz Sac, a leading steel products manufacturer based in the industrial zone of Kayseri.
Location
Kayseri, Türkiye
Power
286 kWp
Inverter
Sungrow SG110CX, SG33CX
Year
2021
Panel
Elin Sirius 450W
Installation Type
Rooftop SPP


