Citus Power Citus Power
  • About
    • Story
    • Business Culture
    • Group Companies
  • Services
    • Development
    • EPC
    • Operation & Maintenance
    • Technical & Financial Advisory
  • Solar Solutions
    • Commercial & Industrial Rooftops
    • Ground-Mounted Solar PV
    • Solar Carports
    • Energy Storage / Hybrid Systems
  • Projects
  • Career
  • Contact
  • EN
    • TR
Citus Power Citus Power
  • EN
    • TR
Menu
  • EN
    • TR
HomeProjects Karamusalar WPP
Previous product
Eskibektaşlı WPP
Ürünlere geri dön
Next product
Savaştepe WPP

Karamusalar WPP

60 MWp
Karamusalar WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Çanakkale, Türkiye
Power
60 MWp
Year
2013
Installation Type
WPP
Category: Projects
Paylaş
Facebook Twitter Email Pinterest linkedin WhatsApp

Projelerimiz

Projects

Tüm Projeler
All Projects
Close

Dost Technical Textiles

439 kWp
Dost Technical Textiles
Dost Cırtbant, Turkey's leading technical textiles factory, preferred Citus Power for the installation of its rooftop SPP.
Location
Tekirdağ, Türkiye
Power
439 kWp
Inverter
Huawei 60 KTL
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Read more
Close

Reka Oil

4.6 MWp
Reka Oil
Reka Oil, one of Europe's largest vegetable oil manufacturing facilities preferred Citus Power to build its industrial rooftop SPP.
Location
Tekirdağ, Türkiye
Power
4.6 MWp
Inverter
Huawei 100KTL
Year
2023
Panel
Elin Sirius 550W
Installation Type
Rooftop SPP
Read more
Close

ASA Energy Storage Project

115 MWp
ASA Enerji Depolama
As part of Citus Power’s own renewable energy portfolio, development of this project started in 2023 and is expected to reach ready-to-build stage in late 2024.
Location
Greece
Power
115 MWp
Year
2023
Read more
Close

Yılmaz Sac Factory

286 kWp
Yılmaz Sac Factory
Citus Power has been the EPC of choice for Yılmaz Sac, a leading steel products manufacturer based in the industrial zone of Kayseri.
Location
Kayseri, Türkiye
Power
286 kWp
Inverter
Sungrow SG110CX, SG33CX
Year
2021
Panel
Elin Sirius 450W
Installation Type
Rooftop SPP
Read more
Close

Karya Construction

319 kWp
Karya Construction
Location
İzmir, Türkiye
Power
319 kWp
Inverter
Huawei 60 KTL
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Read more
Close

Kangal WPP

80 MWp
Kangal WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2015. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies.
Location
Sivas, Türkiye
Power
80 MWp
Year
2015
Read more
Close

Acacia Mining

65 MWp
Acacia Mining
Location
Ankara, Türkiye
Power
65 MWp
Year
2025
Read more
Close

Avlağı WPP

60 MWp
Avlağı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Kayseri, Türkiye
Power
60 MWp
Year
2013
Installation Type
WPP
Read more
Sayfalar
  • Home
  • About
  • Solar Solutions
  • Services
  • Projects
  • Career
  • Contact

© 2026 Citus Power. All rights reserved

the rise, web tasarım, web tasarım ajansı, dijital pazarlama
  • Home
  • About
    • Story
    • Business Culture
    • Group Companies
  • Services
    • Development
    • EPC
    • Operation & Maintenance
    • Technical & Financial Advisory
  • Solar Solutions
    • Commercial & Industrial Rooftops
    • Ground-Mounted Solar PV
    • Solar Carports
    • Energy Storage / Hybrid Systems
  • Projects
  • Career
  • Contact
  • © 2023 Citus Power. All rights reserved
Scroll To Top
Citus Power olarak kişisel verilerinizin güvenliği hususuna azami hassasiyet göstermekteyiz. Bu bilinçle, Şirketimiz olarak, tarafımıza ilişkin tüm şahıslara ait her türlü kişisel verinin 6698 Sayılı Kişisel Verilerin Korunması Kanunu (“KVKK”)'na uygun olarak işlenmesine ve muhafaza edilmesine büyük önem atfetmekteyiz. Bu sorumluluğumuzun tam idraki ile KVKK kapsamında tanımlı “Veri Sorumlusu” sıfatıyla, kişisel verilerinizi aşağıda izah edildiği şekilde ve mevzuat tarafından emredilen sınırlar çerçevesinde işlemekteyiz.
As Citus Power, we attach the utmost importance to the security of your personal data. With this awareness, as our Company, we place great emphasis on processing and safeguarding all personal data belonging to all individuals related to us in accordance with the Law No. 6698 on the Protection of Personal Data (“KVKK”). With full awareness of this responsibility, in our capacity as the “Data Controller” as defined under the KVKK, we process your personal data in the manner explained below and within the limits prescribed by the applicable legislation.
Accept