ASA KB1 SPP
ASA KB1 SPP
As part of Citus Power’s own renewable energy portfolio, development of this project started in 2020 and is expected to reach ready-to-build stage in late 2023.
Location
Yunanistan
Power
65 MWp
Year
2020
Category: Projects
Koç University Hospital

Koç University Hospital
One of Turkey's top private hospitals Koc University Hospital, preferred Citus Power to build its commercial rooftop SPP.
Location
İstanbul, Türkiye
Power
89 kWp
Inverter
Solar edge SE33.3K
Year
2022
Panel
Arçelik 450W
Installation Type
Rooftop SPP
Balsu Food

Balsu Food
Balsu Food is Turkey’s leading hazelnut producer and exporter. The company decided to procure its electricity from solar energy. Balsu preferred Citus Power to build its industrial rooftop SPP.
Location
Sakarya, Türkiye
Power
1.1 MWp
Inverter
Sungrow SG110CX
Year
2022
Panel
Arçelik 450W
Installation Type
Rooftop SPP
Eksun Food

Eksun Food
Citus Power has been the EPC of choice for Eksun Food, producer of Turkey’s most famous flour brands.
Location
Tekirdağ, Türkiye
Power
316 kWp
Inverter
Solar edge SE82.8K, SE27.6K
Year
2021
Panel
Arçelik 455W
Installation Type
Rooftop SPP
ASA KB2 SPP
ASA KB2 SPP
As part of Citus Power’s own renewable energy portfolio, development of this project started in 2020 and is expected to reach ready-to-build stage in late 2023.
Location
Yunanistan
Power
50 MWp
Year
2020
Teksan Generator 2

Teksan Generator 2
Turkey's leading generator manufacturer Teksan preferred Citus Power to build its second stage industrial rooftop SPP.
Location
İstanbul, Türkiye
Power
205 kWp
Inverter
Huawei 100KTL ve 60 KTL
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Hidroser Hydraulic Systems

Hidroser Hydraulic Systems
Hidroser Hydraulic Systems, the world leader in the production of industrial control elements, preferred Citus Power to build its industrial rooftop SPP.
Location
Tekirdağ, Türkiye
Power
341 kWp
Inverter
Sungrow 110CX
Year
2022
Panel
Arçelik 455W
Installation Type
Rooftop SPP
Avlağı WPP
Avlağı WPP
As part of Citus Power’s renewable energy portfolio, development of the project started in 2013. Citus Power conducted site selection, wind mast installation, wind measurements, energy yield assessments, micrositing studies, pre-construction cost studies, license and permitting document preparations. The project was sold to Acwa Power, one of the leading global energy players.
Location
Kayseri, Türkiye
Power
60 MWp
Year
2013
Installation Type
WPP


